Photo Gallery

Material Recovery Facility (MRF)

  • The sorting equipment is currently located in the square building.

  • The quonset hut in the background provides limited storage for baled recyclables awaiting shipping to local buyers.

Vehicle Maintenance Shop and Office

  • Construction & installation of a new vehicle scale in the summer of 2019.

  • Will replace the original late 80's vehicle scale.

  • Note the red trucks on site pouring concrete.

Many Landfill Cells


  • Left: Landfill Cells 1 & 2 (green area)

  • Center: Cells 3 & 4 are currently filling

  • Right: Cell 5 is under construction

New Bomag in Action!

  • The 120,000 lb Bomag Compactor was purchased in the summer of 2019.

  • Assembled onsite, the compactor is used to compact the garbage to make room for more garbage in the landfill.

Site Looking South

  • Left: Public drop-off for tires & scrap metal.

  • Center: MRF and glass crushing area

  • Bottom: East landfill cells and access road.

Temporary Cap

  • Cells #1 and #2: The grassy cap will be removed in the future to expand the landfill horizontally.

  • A permanent plastic cap will be placed when completely full.