Photo Gallery
Material Recovery Facility (MRF)
The sorting equipment is currently located in the square building.
The quonset hut in the background provides limited storage for baled recyclables awaiting shipping to local buyers.
Vehicle Maintenance Shop and Office
Construction & installation of a new vehicle scale in the summer of 2019.
Will replace the original late 80's vehicle scale.
Note the red trucks on site pouring concrete.
Many Landfill Cells
Left: Landfill Cells 1 & 2 (green area)
Center: Cells 3 & 4 are currently filling
Right: Cell 5 is under construction
New Bomag in Action!
The 120,000 lb Bomag Compactor was purchased in the summer of 2019.
Assembled onsite, the compactor is used to compact the garbage to make room for more garbage in the landfill.
Site Looking South
Left: Public drop-off for tires & scrap metal.
Center: MRF and glass crushing area
Bottom: East landfill cells and access road.
Temporary Cap
Cells #1 and #2: The grassy cap will be removed in the future to expand the landfill horizontally.
A permanent plastic cap will be placed when completely full.